
Action Plan
Docs + Word7 pages
Free
When something goes wrong, a vague promise to do better does not satisfy a client or an auditor. This plan moves from the issue, to the root cause, to corrective actions, to preventive actions and finally to verification. Every action starts with a verb, has one owner and has a due date, so the person checking can see what was done and when.
The sample follows Havenbrook Engineering after 312 brackets shipped with bores outside tolerance because a gauge calibration had lapsed. It shows a risk register, an incident timeline, two checklists, a Gantt of preventive work and a verification flow. Replace the issue, owners, dates and figures with your own, and keep the verification date 30 to 90 days out.
Click Make a copy in Google Docs, then confirm on the Google page. The copy is saved to your own Google Drive.
State your issue in one sentence and replace the register, timeline and impact table with your own facts and figures.
Rewrite each action to start with a verb, give it one owner, and spread the due dates with at least one quick win in the first two weeks.
Set the verification date 30 to 90 days after the last action and name the person who will check it.
Delete the guide page, then share the plan with your sponsor and book the review dates.
Corrective actions fix the problem that has already happened and remove its cause. Preventive actions stop the same kind of fault happening elsewhere. This plan keeps them on separate pages.
Between 30 and 90 days. That is long enough for the new process to run through real work and short enough that the evidence is still fresh for the auditor.
No. The organisation, the people, the part numbers and every figure in the sample are fictional. They are there to show what a finished corrective action plan looks like.

Docs + Word7 pages
Free
Docs + Word9 pages
Free
Docs + Word5 pages
Free
Slides + PowerPoint11 slides
Free
Docs + Word6 pages
Free
Slides + PowerPoint11 slides
Free
Docs + Word7 pages
Free